
Signs it's time
- Repeated leaks in different spots
- Shingles brittle, curling or blowing off
- Metal panels rusted through
- Widespread hail damage
- Flat roof wet over large areas
Options
Metal
Sheds snow, resists wind, lasts decades. Metal roofing.
Shingles
GAF, Owens Corning, Malarkey. Shingle roofing.
TPO
For flat roofs. TPO flat roofs.
Coating
For roofs still sound enough. Coatings.

Built for the climate
- High-wind fastening patterns
- Ice and water shield at eaves and valleys
- Impact-resistant options
- Balanced attic ventilation
Call (505) 381-5017 for a replacement estimate.
Common questions
How long does a reroof take?
Often one to three days for a home.
Do I need a permit?
Reroofing usually requires one. We'll explain the process for your county.